In response to Hurricane Sandy, the U.S. Army Corps of Engineers led Joint Dewatering Task Force is executing pumping operations with state and federal partners at six flooded mass transit sites in response to FEMA’s $20 million mission assignment. The Joint Dewatering Task Force is concentrating its pumping efforts at the following locations: Battery Park Exchange, Brooklyn Battery Tunnel, Queens Midtown Tunnel, Rockaway Wastewater Treatment Plant, Passaic Valley Waste Water Treatment Plant, World Trade Center, 14th Street Tunnel-Canarsie (L Subway), and the Montague Street Tunnel (N, R Subway).
Date Taken: | 11.04.2012 |
Date Posted: | 11.06.2012 12:23 |
Photo ID: | 775827 |
VIRIN: | 121104-A-AB280-017 |
Resolution: | 3872x2592 |
Size: | 5.81 MB |
Location: | NEW YORK, NY, US |
Web Views: | 47 |
Downloads: | 2 |
This work, Hurricane Sandy response [Image 16 of 16], by Brooks Hubbard IV, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT