A snowplow operator from the 88th Civil Engineer Squadron clears a walkway Jan. 22 at Wright-Patterson Air Force Base, Ohio. The installation team is responsible for treating, maintaining, and clearing snow and ice from 120 miles of roads, 12.5 million square feet of parking lots, and 283,000 square feet of sidewalks, stairs and flightline. (U.S. Air Force photo by Hannah Carranza)
Date Taken: | 01.22.2023 |
Date Posted: | 01.31.2023 09:51 |
Photo ID: | 7609998 |
VIRIN: | 230122-F-YM631-1147 |
Resolution: | 3000x2000 |
Size: | 1.44 MB |
Location: | WRIGHT-PATTERSON AIR FORCE BASE, OHIO, US |
Web Views: | 6 |
Downloads: | 4 |
This work, Jan. 22 Snow on Wright-Patt [Image 26 of 26], by Hannah Carranza, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.