Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Backflow prevention device maintenance [Image 1 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Backflow prevention device maintenance

    SAN ANTONIO, TEXAS, UNITED STATES

    12.01.2022

    Photo by Jonathan Mallard 

    502nd Air Base Wing

    Joshua Douglas, 502nd Civil Engineer Squadron plumber, bleeds test cocks on a backflow prevention device December 1, 2022 Joint Base San Antonio-Randolph, Texas. The 502nd Civil Engineer Squadron regularly conducts preventive checks and maintenance to critical base infrastructure to ensure JBSA mission success. (U.S. Air Force photos by Jonathan Mallard)

    IMAGE INFO

    Date Taken: 12.01.2022
    Date Posted: 12.02.2022 14:35
    Photo ID: 7537574
    VIRIN: 221201-F-YD772-0007
    Resolution: 7008x4672
    Size: 20.37 MB
    Location: SAN ANTONIO, TEXAS, US

    Web Views: 93
    Downloads: 3

    PUBLIC DOMAIN