Two C-130J Super Hercules fly over Yokota Air Base, Japan, during the Samurai Readiness Inspection, Oct. 12, 2022. The full-scale exercise is designed to enhance base readiness through training and practicing skillsets, ensuring the base is ready to respond to real-world contingencies. (U.S. Air Force photo by Machiko Arita)
| Date Taken: | 10.12.2022 |
| Date Posted: | 10.17.2022 01:42 |
| Photo ID: | 7465706 |
| VIRIN: | 221012-F-DY012-0317 |
| Resolution: | 4579x3271 |
| Size: | 5.44 MB |
| Location: | YOKOTA AIR BASE, TOKYO, JP |
| Web Views: | 22 |
| Downloads: | 7 |
This work, 374th Airlift Wing kicks off wing readiness inspection [Image 12 of 12], by Machiko Arita, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.