U.S. Air Force Master Sgt. Tanya Nicolay, 87th Operational Medical Readiness Squadron public health flight chief, speaks to Joint Base McGuire-Dix-Lakehurst senior enlisted leadership at the Joint Perspective panel inside the 305th Operations Support Squadron Aircrew Flight Equipment classroom on JB MDL, N.J., Oct. 3, 2022. As part of the Leading Edge program, the Joint Perspective panel is a class involving senior enlisted leadership from each military branch to meet with students to share their services’ perspectives on joint operations and how their branches integrate on the battlefield. JB MDL kicks off the Leading Edge program designed to prepare all service members in the ranks of E4 to E-6 with the basic foundations to further support joint base operations. During the program, students will be required to work in small groups, comprehend and synthesize information presented to them, and create solutions to the capstone objectives provided. (U.S. Air Force photo by Daniel Barney)
| Date Taken: | 10.03.2022 |
| Date Posted: | 10.12.2022 14:23 |
| Photo ID: | 7459620 |
| VIRIN: | 221003-F-GC783-1077 |
| Resolution: | 3045x2700 |
| Size: | 1.77 MB |
| Location: | JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY, US |
| Web Views: | 30 |
| Downloads: | 4 |
This work, Joint Base MDL commences weeklong Leading Edge program [Image 11 of 11], by Daniel Barney, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.