Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Joint Base MDL commences weeklong Leading Edge program [Image 6 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Joint Base MDL commences weeklong Leading Edge program

    JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY, UNITED STATES

    10.05.2022

    Photo by Daniel Barney 

    Joint Base McGuire-Dix-Lakehurst

    A student hammers a wedge into a mock, ruptured object to prevent more leakage of water as part of training, during the damage control assessment class outside the U.S. Coast Guard Atlantic Strike Team facility on Joint Base McGuire-Dix-Lakehurst, N.J., Oct. 5, 2022. The damage control assessment is a team building event for service members to learn the basic fundamentals on how to repair potential environmental hazards onboard naval ships, such as leakage and damaged pipelines, in order to prevent loss of essential equipment and the lives of other service members. JB MDL kicks off the Leading Edge program designed to prepare all service members in the ranks of E4 to E-6 with the basic foundations to further support joint base operations. During the program, students will be required to work in small groups, comprehend and synthesize information presented to them, and create solutions to the capstone objectives provided. (U.S. Air Force photo by Daniel Barney)

    IMAGE INFO

    Date Taken: 10.05.2022
    Date Posted: 10.12.2022 14:22
    Photo ID: 7459614
    VIRIN: 221005-F-GC783-1262
    Resolution: 4046x2700
    Size: 2.7 MB
    Location: JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY, US

    Web Views: 36
    Downloads: 5

    PUBLIC DOMAIN