Students pose for a picture with service members of senior enlisted leadership, while holding certificates at the Joint Base McGuire-Dix-Lakehurst Leading Edge graduation ceremony inside the 305th Operations Support Squadron Aircrew Flight Equipment auditorium on Joint Base MDL, N.J., Oct. 7, 2022. JB MDL kicks off the Leading Edge program designed to prepare all service members in the ranks of E4 to E-6 with the basic foundations to further support joint base operations. During the program, students will be required to work in small groups, comprehend and synthesize information presented to them, and create solutions to the capstone objectives provided. (U.S. Air Force photo by Daniel Barney)
| Date Taken: | 10.07.2022 |
| Date Posted: | 10.12.2022 14:26 |
| Photo ID: | 7459609 |
| VIRIN: | 221007-F-GC783-1046 |
| Resolution: | 6050x2700 |
| Size: | 3.9 MB |
| Location: | JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY, US |
| Web Views: | 20 |
| Downloads: | 3 |
This work, Joint Base MDL commences weeklong Leading Edge program [Image 11 of 11], by Daniel Barney, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.