Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Airmen Perform Maintenance During an ISO Inspection [Image 1 of 10]

    Airmen Perform Maintenance During an ISO Inspection

    NEW CASTLE, DE, UNITED STATES

    09.14.2022

    Photo by Staff Sgt. Amanda Bodony  

    166th Airlift Wing

    Staff Sgt. Nicholas Hynson, Staff Sgt. Joseph Todd, and Senior Airman Alishia Patricio, Avionics Communication Navigation Weapons System Technicians, perform safety wiring on station keeping equipment radom. The 166th Maintenance Group is conducting a Number Four Major Isochronal Inspection in order to maintain mission readiness.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.14.2022
    Date Posted: 09.16.2022 11:59
    Photo ID: 7418611
    VIRIN: 220904-Z-OZ300-1147
    Resolution: 6048x4024
    Size: 6.38 MB
    Location: NEW CASTLE, DE, US

    Web Views: 10
    Downloads: 3

    PUBLIC DOMAIN