Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Gate keepers: Installing new miter gates at New Cumberland requires planning, time, extra measures [Image 22 of 22]

    Gate keepers: Installing new miter gates at New Cumberland requires planning, time, extra measures

    MORAINE, OH, UNITED STATES

    08.10.2022

    Photo by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    Dale Hohman, the captain of the U.S. Army Corps of Engineers Medium Capacity Fleet, talks on the radio while navigating a tow boat at the New Cumberland Locks and Dam on the Ohio River in Moraine, Ohio, Aug. 10, 2022. The fleet has been working to replace the upstream and downstream miter gates of the auxiliary lock, with repairs projected to complete by 2024. The Medium Capacity Fleet is headquartered in Pittsburgh but operated by the Huntington District to perform maintenance and repair projects on the rivers for waterway navigation. The New Cumberland facility is operated by the U.S. Army Corps of Engineers Pittsburgh District. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.10.2022
    Date Posted: 08.17.2022 15:06
    Photo ID: 7374869
    VIRIN: 220810-A-TI382-1777
    Resolution: 5472x3648
    Size: 4.54 MB
    Location: MORAINE, OH, US

    Web Views: 34
    Downloads: 6

    PUBLIC DOMAIN