U.S. Airmen with the 325th Fighter Wing and civilians identify potential concerns during a Rehearsal of Concepts Drill at Tyndall Air Force Base, Florida, Aug. 2, 2022. Planning for the future F-35A Lightning II mission requires a cross-disciplinary team of engineers, planners and operational stakeholders to ensure smooth and timely execution of both the current mission and rebuild. (U. S. Air Force photo by Staff Sgt. Stefan Alvarez)
Date Taken: | 08.02.2022 |
Date Posted: | 08.08.2022 11:42 |
Photo ID: | 7358633 |
VIRIN: | 220802-F-MG692-1018 |
Resolution: | 8256x5504 |
Size: | 1.75 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 9 |
Downloads: | 3 |
This work, Tyndall ROCs and rolls with future flight line construction rehearsal [Image 3 of 3], by SrA Stefan Alvarez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.