Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    ANG units work alongside 36 CS to operationalize Andersen AFB [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    ANG units work alongside 36 CS to operationalize Andersen AFB

    ANDERSEN AIR FORCE BASE, GUAM

    07.26.2022

    Photo by Airman 1st Class Lauren Clevenger 

    36th Wing

    U.S. Air National Guard Master Sgt. Nicholas Martinez, 205th Engineering Installation Squadron first sergeant, and Staff Sgt. Zachery Muth, 210th Engineering Installation Squadron cable antenna systems craftsman, assist Airman 1st Class Abu Bangura, 205 EIS cable antenna systems apprentice, exit a telecommunications maintenance hole on Andersen Air Force Base, Guam, July 26, 2022. U.S. Air National Guard engineering installation squadrons from across the country have integrated as one unit to work alongside the 36th Communications Squadron to refresh records and repair infrastructure on Andersen AFB. (U.S. Air Force photo by Airman 1st Class Lauren Clevenger)

    IMAGE INFO

    Date Taken: 07.26.2022
    Date Posted: 08.02.2022 02:23
    Photo ID: 7348152
    VIRIN: 220726-F-NI202-1021
    Resolution: 5588x3992
    Size: 7.25 MB
    Location: ANDERSEN AIR FORCE BASE, GU

    Web Views: 138
    Downloads: 10

    PUBLIC DOMAIN