Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
Issued by: on
Detailed survey views of the Mir Space Station exterior for Detailed Test Objective (DTO) 1118. Includes: Solar arrays and surface details.
NASA Identifier: STS084-340-019
| Date Taken: |
05.23.2011 |
| Date Posted: |
10.17.2012 17:22 |
| Photo ID: |
731235 |
| Resolution: |
4157x2743 |
| Size: |
12.78 MB |
| Location: |
WASHINGTON, DISTRICT OF COLUMBIA, US |
| Web Views: |
12 |
| Downloads: |
1 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS