Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    First transient troops training barracks construction project, funded in FY 2019, completed at Fort McCoy [Image 6 of 25]

    First transient troops training barracks construction project, funded in FY 2019, completed at Fort McCoy

    A view of a new multi-million dollar transient troop training barracks is shown April 5, 2022, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barracks in September 2019. On April 1, 2022, the barracks was turned over from the contractor to the Fort McCoy Directorate of Public Works. The barracks is different than the traditional World War II-era barracks that are located throughout the installation’s cantonment area. This new building is four stories and is able to house 400 people in approximately 60,000 square feet. The project also was the first of eight new buildings planned for the entire 1600 block at Fort McCoy. The plan is to build three more barracks with the same specifications, three 20,000-square-foot brigade headquarters buildings, and one 160-room officer quarters. This was an Army Corps of Engineers-managed project. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.05.2022
    Date Posted: 04.13.2022 15:07
    Photo ID: 7137454
    VIRIN: 220405-A-OK556-572
    Resolution: 5440x3628
    Size: 3.41 MB
    Location: FORT MCCOY, WI, US

    Web Views: 0
    Downloads: 3

    PUBLIC DOMAIN