Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Rhine Ordnance Barracks Medical Center Replacement project [Image 2 of 7]

    Rhine Ordnance Barracks Medical Center Replacement project

    Lt. Gen. Scott A. Spellmon, Commanding General of the U.S. Army Corps of Engineers (USACE), and Gary Lopez, Senior Program Manager with the USACE Europe District Hospital Program Integration Office, review a map of the construction site of the Rhine Ordnance Barracks Medical Center Replacement project at Rhine Ordnance Barracks, Germany, March 15, 2022. The German Construction Administration, in partnership with the U.S. Army Corps of Engineers, Europe District and the U.S. Defense Health Agency, awarded a €859 million (approximately $969 million) contract to Züblin and Gilbane Joint Venture to construct the new hospital. (U.S. Army photo by Alfredo Barraza)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.15.2022
    Date Posted: 04.04.2022 09:32
    Photo ID: 7124104
    VIRIN: 220315-A-GH914-0018
    Resolution: 6016x4016
    Size: 4.27 MB
    Location: RP, DE

    Web Views: 125
    Downloads: 4

    PUBLIC DOMAIN