Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
2-D Low-Turbulence Pressure Tunnel (LTPT)
Issued by: on
Construction of 2-D Low-Turbulence Pressure Tunnel (LTPT).
NASA Identifier: L19688
| Date Taken: |
12.10.2009 |
| Date Posted: |
10.10.2012 15:59 |
| Photo ID: |
706490 |
| Resolution: |
1536x1185 |
| Size: |
290.92 KB |
| Location: |
WASHINGTON, DISTRICT OF COLUMBIA, US |
| Web Views: |
4 |
| Downloads: |
0 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS