Friday, February 18, 2022, the U.S. Army Corps of Engineers, with our State and Federal partners, observed a tremendous milestone with the groundbreaking of the Indian River Lagoon-South C-23/24 Stormwater Treatment Area project.
It is the first significant construction feature of the India River Lagoon-South project to address the C-23 and C-24 basins in St. Lucie.
"This is a watershed moment for us. We just completed construction on the C-44 Reservoir and Stormwater Treatment Area Complex, we're putting C-23/24 components in the ground, and the construction of the Indian River Lagoon-South C-23/24 North Reservoir is fully funded. We've got incredible momentum right now," said Jacksonville District Commander James Booth. (U.S. Army Corps of Engineer Photo by Brigida I. Sanchez)
Date Taken: | 02.18.2022 |
Date Posted: | 02.23.2022 16:58 |
Photo ID: | 7064543 |
VIRIN: | 220218-A-AZ289-1698 |
Resolution: | 4500x3000 |
Size: | 7.43 MB |
Location: | ST. LUCIE, FLORIDA, US |
Hometown: | JACKSONVILLE, FLORIDA, US |
Hometown: | PALM BEACH GARDENS, FLORIDA, US |
Web Views: | 34 |
Downloads: | 4 |
This work, Indian River Lagoon-South C-23/24 Stormwater Treatment Area Project [Image 11 of 11], by Brigida Sanchez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.