Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
Shepherd uses power tool to remove rack restraining bolts
Issued by: on
Expedition One commander William (Bill) Shepherd uses a power tool to remove rack restraining bolts in the MPLM/Leonardo module.
NASA Identifier: sts102-368-026
| Date Taken: |
10.26.2010 |
| Date Posted: |
10.10.2012 14:17 |
| Photo ID: |
698879 |
| Resolution: |
2970x1960 |
| Size: |
1.59 MB |
| Location: |
WASHINGTON, DISTRICT OF COLUMBIA, US |
| Web Views: |
11 |
| Downloads: |
1 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS