Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
16 Foot Calibration Center Line Probe
Issued by: on
Chad Rice with installed calibration model in the 16 Foot Transonic Tunnel with test section top removed.
NASA Identifier: L90-11039
| Date Taken: |
12.09.2009 |
| Date Posted: |
10.10.2012 13:41 |
| Photo ID: |
696169 |
| Resolution: |
1536x1310 |
| Size: |
189.44 KB |
| Location: |
WASHINGTON, DISTRICT OF COLUMBIA, US |
| Web Views: |
4 |
| Downloads: |
0 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS