M1 Abrams hulls preparing to be inducted into the upgrade process.
| Date Taken: | 11.24.2021 |
| Date Posted: | 11.30.2021 17:00 |
| Photo ID: | 6958468 |
| VIRIN: | 211124-D-TH175-412 |
| Resolution: | 5184x3456 |
| Size: | 6.98 MB |
| Location: | LIMA, OHIO, US |
| Web Views: | 619 |
| Downloads: | 29 |
This work, Joint Systems Manufacturing Center-Lima [Image 9 of 9], by Brian Hahn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.