Contractors with Messer Construction place a steel beam on the five-story Intelligence Production Complex during a “topping out” ceremony, October 27, 2021 at Wright-Patterson Air Force Base in Ohio. The ceremony which signifies when the highest beam is placed on a structure incorporates signatures from project team members, an American flag at the highest point and a traditional evergreen which has origins from Scandinavian folklore. (U.S. Army Corps of Engineers photo by Charles Delano)
Date Taken: | 10.27.2021 |
Date Posted: | 10.28.2021 12:11 |
Photo ID: | 6910811 |
VIRIN: | 211027-A-PA223-020 |
Resolution: | 1600x1067 |
Size: | 335.14 KB |
Location: | WRIGHT-PATTERSON AIR FORCE BASE, OHIO, US |
Web Views: | 30 |
Downloads: | 7 |
This work, USACE IPC III project is topped out [Image 2 of 2], by Charles Delano, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.