U.S. Army Engineer Research and Development Center researchers evaluate dredged material from the Houston Ship Channel Expansion Improvement Project with instrumentation in the Environmental Laboratory in Vicksburg, Mississippi, September 2018. The researchers evaluated the material from the 52-mile-long ship channel and modeled its potential environmental impacts using agreed-upon, site-specific modeling parameters in consultation with the Texas Commission on Environmental Quality.
Date Taken: | 08.12.2021 |
Date Posted: | 08.19.2021 09:18 |
Photo ID: | 6780847 |
VIRIN: | 210812-A-A1403-003 |
Resolution: | 644x481 |
Size: | 66.7 KB |
Location: | VICKSBURG, MS, US |
Web Views: | 6 |
Downloads: | 2 |
This work, ERDC researcher’s detective work helps ship channel improvement project stay on track [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT