Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Connecticut's 250th Engineer Company Bridges The Gap [Image 8 of 14]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Connecticut's 250th Engineer Company Bridges The Gap

    NEW LONDON, CONNECTICUT, UNITED STATES

    06.11.2020

    Photo by Sgt. Matthew Lucibello 

    Connecticut National Guard Recruiting

    A U.S. Army National Guard soldier assigned to the 250th Engineer Company (Multi-Role Bridge Company), 192nd Engineer Battalion, Connecticut Army National Guard, connects two sections of an Improved Ribbon Bridge on the Thames River, New London, Connecticut, June 11th, 2020. Each section, or bay, of bridge is approximately 22 feet long and weighs around 13,000 pounds. (U.S. Army photo by Sgt. Matthew Lucibello)

    IMAGE INFO

    Date Taken: 06.11.2020
    Date Posted: 07.21.2021 15:34
    Photo ID: 6743629
    VIRIN: 200611-Z-QC464-1070
    Resolution: 5472x3648
    Size: 1.1 MB
    Location: NEW LONDON, CONNECTICUT, US

    Web Views: 70
    Downloads: 4

    PUBLIC DOMAIN