Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Hill engineers work to improve A-10 APU insulation [Image 2 of 10]

    Hill engineers work to improve A-10 APU insulation

    HILL AIR FORCE BASE, UT, UNITED STATES

    06.23.2021

    Photo by Cynthia Griggs 

    Hill Air Force Base

    Jared Hainsworth (left), A-10 System Program Office, and Stephan Hall, Honeywell test engineer, look inside the auxiliary power unit bay of an A-10 Thunderbolt II aircraft June 23, 2021, at Hill Air Force Base, Utah. The engineers were determining where they would be placing thermal couplers to determine temperatures inside the bay during a ground test. (U.S. Air Force photo by Cynthia Griggs)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.23.2021
    Date Posted: 07.15.2021 13:29
    Photo ID: 6734216
    VIRIN: 210623-F-EF974-2004
    Resolution: 5322x3541
    Size: 4.71 MB
    Location: HILL AIR FORCE BASE, UT, US

    Web Views: 60
    Downloads: 9

    PUBLIC DOMAIN