Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Washington Navy Yard Building 46 and 67 contaminated soil remediation rotosonic drilling [Image 3 of 3]

    Washington Navy Yard Building 46 and 67 contaminated soil remediation rotosonic drilling

    Wells were installed in the footprint of Buildings 46 and 67 on Washington Navy Yard to decontaminate soil and groundwater. Well heads are temporarily recessed and buried to prevent damage during construction. Here, a rotosonic drill rig drills injection wells in Building 67.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.15.2020
    Date Posted: 06.09.2021 13:23
    Photo ID: 6684167
    VIRIN: 210609-N-HG124-1003
    Resolution: 4032x3024
    Size: 2.8 MB
    Location: DC, US

    Web Views: 39
    Downloads: 3

    PUBLIC DOMAIN