Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    NMCB 4 Builds Pre-Engineered Buildings for NBU 7 [Image 1 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    NMCB 4 Builds Pre-Engineered Buildings for NBU 7

    210331-N-EJ338-1001 SASEBO, Japan (March 31, 2021) Builder 3rd Class Matthew Fouch assigned to Naval Mobile Construction Battalion 4, manually threads a piece of conduit to be later connected to a coupling. Detail Sasebo Seabees are in the initial stages of interior electrical work for a 3,200 square-foot pre-engineered building (PEB) being constructed for Naval Beach Unit-7. NMCB 4 is forward-deployed throughout the Indo-Pacific region ready to support major combat operations, humanitarian assistance and disaster relief and to provide general engineering and civil support to U.S. and joint forces. (U.S. Navy photo by Utilitiesman 3rd​​ Class Colin Haydt)

    IMAGE INFO

    Date Taken: 03.29.2021
    Date Posted: 04.27.2021 10:45
    Photo ID: 6615852
    VIRIN: 210329-N-EJ338-072
    Resolution: 4032x3024
    Size: 2.9 MB
    Location: YOKOSE, NAGASAKI, JP

    Web Views: 32
    Downloads: 3

    PUBLIC DOMAIN