Donnie Bull, Shaw Environmental and Infrastructure Group lead electrician, and Tom Ojala, Shaw electrician journeyman, make their way down a slope of Mount Gordon Lyon, to repair damage to the summit star, Sept. 6, 2012. The star will be lit, Sept. 11, in memory of those who lost their lives in the 9/11 terrorist attacks and will then be re-lit the day after Thanksgiving. The star will stay lit from that time until the last of the mushers from the Iditarod Trail Sled Dog Race crosses the finish line.
| Date Taken: | 09.06.2012 |
| Date Posted: | 09.07.2012 20:05 |
| Photo ID: | 659594 |
| VIRIN: | 120906-F-NZ143-037 |
| Resolution: | 2762x3000 |
| Size: | 3.94 MB |
| Location: | JOINT BASE ELMENDORF-RICHARDSON, ALASKA, US |
| Web Views: | 5 |
| Downloads: | 3 |
This work, Preparing the summit star [Image 9 of 9], by TSgt Zachary Wolf, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.