The U.S. Army Corps of Engineers Nashville District lifts the rotor assembly from a 270-ton hydropower unit undergoing rehabilitation at the Barkley Dam Hydropower Plant in Kuttawa, Ky., Aug. 16, 2012.
| Date Taken: | 08.16.2012 |
| Date Posted: | 08.20.2012 11:57 |
| Photo ID: | 648573 |
| VIRIN: | 120816-A-EO110-001 |
| Resolution: | 4288x2848 |
| Size: | 5.58 MB |
| Location: | KUTTAWA, KENTUCKY, US |
| Web Views: | 49 |
| Downloads: | 4 |
This work, Barkley hydropower rehabilitation gets a 270-ton lift [Image 6 of 6], by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.