Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    J. Edward Roush Lake staff finishes some work in the stilling basin showing the dam at a no-flow state before opening it back up. [Image 24 of 24]

    J. Edward Roush Lake staff finishes some work in the stilling basin showing the dam at a no-flow state before opening it back up.

    HUNTINGTON, IN, UNITED STATES

    09.24.2019

    Photo by Mariah Underwood 

    U.S. Army Corps of Engineers, Chicago District

    J. Edward Roush Lake staff finishes some work in the stilling basin showing the dam at a no-flow state before opening it back up.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.24.2019
    Date Posted: 10.09.2020 10:58
    Photo ID: 6385600
    VIRIN: 190924-A-EX240-026
    Resolution: 5147x2895
    Size: 2.57 MB
    Location: HUNTINGTON, IN, US

    Web Views: 31
    Downloads: 1

    PUBLIC DOMAIN