Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Little Rock maintenance squadron achieves full operational capability [Image 2 of 8]

    Little Rock maintenance squadron achieves full operational capability

    LITTLE ROCK AIR FORCE BASE, AR, UNITED STATES

    08.25.2020

    Photo by Airman 1st Class Jayden Ford 

    19th Airlift Wing

    Airman 1st Class Daniel Bermudez, 314th Aircraft Maintenance Squadron crew chief, descends stairs after performing routine maintenance on a C-130J Super Hercules at Little Rock Air Force Base, Arkansas, Aug. 25, 2020. The 314th AMXS achieved full operational capability, Sept. 1, 2020, marking the successful reconstitution of an active-duty maintenance force. The designation signifies that the squadron has met a rigorous set of criteria, including an approved concept of operations and a high percentage of trained, qualified and certified personnel. (U.S. Air Force photo by Airman 1st Class Jayden Ford)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.25.2020
    Date Posted: 09.03.2020 13:07
    Photo ID: 6338946
    VIRIN: 200825-F-XY725-1043
    Resolution: 5331x3808
    Size: 1.62 MB
    Location: LITTLE ROCK AIR FORCE BASE, AR, US

    Web Views: 19
    Downloads: 8

    PUBLIC DOMAIN