200828-N-HH853-1019 SILVERDALE, Wash. (Aug. 28, 2020) - Seabees assigned to Naval Facilities Engineering Command (NAVFAC) Northwest work alongside Brundage-Bone Concrete Pumping (BBCP) contractors to lay concrete. The new sidewalk ensures that there is an ADA access from the rear parking lot of the Naval Base Kitsap- Bangor Litehouse School-Age Care Center to the front of the building. (U.S. Navy photo by Mass Communication Specialist 3rd Class Emilia Hilliard/Released)
Date Taken: | 08.28.2020 |
Date Posted: | 09.01.2020 15:28 |
Photo ID: | 6335973 |
VIRIN: | 200828-N-HH853-1019 |
Resolution: | 3559x2545 |
Size: | 1.98 MB |
Location: | NAVAL BASE KITSAP-BREMERTON, WA, US |
Hometown: | NAVAL BASE KITSAP-BREMERTON, WA, US |
Web Views: | 15 |
Downloads: | 5 |
This work, Seabees lay concrete for ADA sidewalk [Image 8 of 8], by PO1 Emilia Hilliard, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT