Five-thousandth shipment of FUSRAP-related material prepares to leave the Luckey Site.
Date Taken: | 07.31.2020 |
Date Posted: | 07.31.2020 14:29 |
Photo ID: | 6292738 |
VIRIN: | 200731-A-A1409-001 |
Resolution: | 4032x3024 |
Size: | 5.67 MB |
Location: | LUCKEY, OH, US |
Web Views: | 5 |
Downloads: | 5 |
This work, LUCKEY FUSRAP SITE SAFELY TRANSPORTS 5,000th TRUCKLOAD OF MATERIAL FOR DISPOSAL – PHASE 1 EXCAVATION COMPLETE [Image 3 of 3], by Susan Blair, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT