JOHN MARTIN RESERVOIR, Colo. -- Mineralization and debris buildup in the air vents. The air vents were cleaned out after being inspected in June 2020. The removal of the buildup allows the vents to function as designed.
Date Taken: | 06.01.2020 |
Date Posted: | 08.04.2020 21:26 |
Photo ID: | 6291649 |
VIRIN: | 200601-A-A1412-003 |
Resolution: | 1280x960 |
Size: | 960.35 KB |
Location: | JOHN MARTIN RESERVOIR, CO, US |
Hometown: | ALBUQUERQUE, NM, US |
Hometown: | HASTY, CO, US |
Hometown: | LA JUNTA, CO, US |
Hometown: | LAMAR, CO, US |
Hometown: | LAS ANIMAS, CO, US |
Hometown: | PUEBLO, CO, US |
Hometown: | ROCKY FORD, CO, US |
Web Views: | 28 |
Downloads: | 1 |
This work, USACE-Albuquerque District’s John Martin conduit project results in much needed maintenance and repairs [Image 6 of 6], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT