Army veteran Scott Letts, a journeyman ironworker with New York Steel & Precast guides a roof bar joist into place on the new base gym at Niagara Falls Air Reserve Station, N.Y. on July 7th, 2020. Construction is on schedule for this 26,000 square foot facility and expected to be completed by July of 2021. (U.S. Air Force photo by Peter Borys)
| Date Taken: | 07.07.2020 |
| Date Posted: | 07.15.2020 08:14 |
| Photo ID: | 6267704 |
| VIRIN: | 200707-F-YZ899-0113 |
| Resolution: | 2400x3000 |
| Size: | 1.77 MB |
| Location: | NIAGARA FALLS ARS, NEW YORK, US |
| Web Views: | 26 |
| Downloads: | 7 |
This work, Base gym construction on schedule [Image 3 of 3], by Peter Borys, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.