A U.S. Army Corps of Engineers Tulsa District electrical contractor makes an assessment as he looks in the overhead ceiling tiles at Oklahoma State University Medical Center, Tulsa, Okla., on April 29, 2020. While working on a FEMA mission assignment at the request of the state of Oklahoma, the Tulsa District executed planning, assessment, design and construction missions supporting state requests for two alternate care facilities. Four floors of the OSU Medical Center in Tulsa Okla., were remodeled providing an additional 116 beds and Integris Baptist Portland Campus in Oklahoma City Okla., providing an additional 110 beds. USACE has the capability and expertise to adjust alternate care facility designs between COVID and non-COVID, depending on states’ needs for specific site locations. The estimated 14 day construction process began at both facilities on April 27, 2020. (Released/U.S. Army Photo by Preston L. Chasteen)
Date Taken: | 04.29.2020 |
Date Posted: | 06.10.2020 13:28 |
Photo ID: | 6236821 |
VIRIN: | 200429-A-IF821-0015 |
Resolution: | 1600x2400 |
Size: | 3.63 MB |
Location: | US |
Web Views: | 6 |
Downloads: | 2 |
This work, Tulsa District constructs alternate care facilities for the state of Oklahoma [Image 22 of 22], by Preston Chasteen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.