A civilian contractor replaces part of a roof at a construction site on Royal Air Force Lakenheath, England, April 21, 2020. The 48th Civil Engineer Squadron, partnering with civilian contractors, are ensuring infrastructure across the 48th Fighter Wing are ready to meet today’s mission and future missions, despite the current COVID-19 pandemic. (U.S. Air Force photo by Airman 1st Class Madeline Herzog)
| Date Taken: | 04.21.2020 |
| Date Posted: | 04.24.2020 12:57 |
| Photo ID: | 6186500 |
| VIRIN: | 200421-F-ZB805-0012 |
| Resolution: | 6540x4912 |
| Size: | 2.71 MB |
| Location: | RAF LAKENHEATH, SUFFOLK, GB |
| Web Views: | 32 |
| Downloads: | 7 |
This work, Construction continues at 48th Fighter Wing despite COVID-19 [Image 6 of 6], by SSgt Madeline Herzog, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.