Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Miami Beach Convention Center Conversion COVID-19 April 09, 2020 [Image 6 of 27]

    Miami Beach Convention Center Conversion COVID-19 April 09, 2020

    MIAMI BEACH, FL, UNITED STATES

    04.09.2020

    Photo by Brigida Sanchez 

    U.S. Army Corps of Engineers, Jacksonville District

    The Miami Beach Convention Center is now a 24 hour construction site, USACE staff awarded a construction contract Monday April 6, 2020 for $22.5 Million to Robins & Morton of Miami, Fla. to convert the Miami Beach Convention Center into a 450-bed hospital. Public Safety is the Corps top priority. The site is equipped with personal protective equipment and medical personnel to help mitigate the spread of COVID -19 at the site.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.09.2020
    Date Posted: 04.13.2020 12:38
    Photo ID: 6170800
    VIRIN: 200409-A-AZ289-1214
    Resolution: 4000x6000
    Size: 12.44 MB
    Location: MIAMI BEACH, FL, US
    Hometown: JACKSONVILLE, FL, US
    Hometown: MIAMI, FL, US

    Web Views: 11
    Downloads: 11

    PUBLIC DOMAIN