Contractors work on water main construction and replacement Nov. 14, 2019, in the 1200 block on the cantonment area at Fort McCoy, Wis. The construction is part of ongoing work to replace water mains throughout the installation that is being coordinated with contractors by the Fort McCoy Directorate of Public Works. The work in the 1200 and nearby areas consists of replacing the water main and lateral services on South R Street from South 10th Avenue to South 11th Avenue. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
| Date Taken: | 11.14.2019 |
| Date Posted: | 11.22.2019 10:55 |
| Photo ID: | 5931306 |
| VIRIN: | 191114-A-OK556-689 |
| Resolution: | 6000x4000 |
| Size: | 7.13 MB |
| Location: | FORT MCCOY, WISCONSIN, US |
| Web Views: | 1 |
| Downloads: | 3 |
This work, Contractors work on water main construction, replacement at Fort McCoy [Image 23 of 23], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.