Paul Bijhouwer, a civil engineer with the Army Corps of Engineer, Buffalo District, inspects for any damage of the Bird Island Pier’s foundation November 6, 2019. The Army Corps of Engineers, Buffalo District, and the Buffalo Department of Public Works inspected the pier to get an assessment of the amount of damage the October 31, 2019 storm caused to the structure. The storm on Halloween created 10-20 foot waves, which caused a portion of the pier to be pushed of its foundation and into the Black Rock Canal located in Buffalo, NY.
Date Taken: | 11.06.2019 |
Date Posted: | 11.07.2019 16:33 |
Photo ID: | 5895487 |
VIRIN: | 191106-A-AU931-007 |
Resolution: | 3376x2412 |
Size: | 1.32 MB |
Location: | BUFFALO, NY, US |
Web Views: | 8 |
Downloads: | 2 |
This work, USACE, DPW inspects Bird Island Pier’s storm damage [Image 8 of 8], by Susan Blair, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT