A worker with contractor Kaiyuh Services works on replacing sections of concrete Oct. 29, 2019, on East G Street between East 12th Avenue and Washrack Road on the cantonment area at Fort McCoy, Wis. Kaiyuh Services was awarded a $170,000 contract earlier in 2019 to complete the work. The work includes repairing the dilapidated joints in the concrete, and the contract is coordinated by the Fort McCoy Directorate of Public Works. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
| Date Taken: | 10.29.2019 |
| Date Posted: | 10.31.2019 15:40 |
| Photo ID: | 5876363 |
| VIRIN: | 191029-A-OK556-799 |
| Resolution: | 6000x4000 |
| Size: | 6.87 MB |
| Location: | FORT MCCOY, WISCONSIN, US |
| Web Views: | 2 |
| Downloads: | 1 |
This work, Contractors complete road repair work at Fort McCoy [Image 11 of 11], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.