Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Mattawoman Creek Mitigation Bank Site Visit [Image 2 of 7]

    Mattawoman Creek Mitigation Bank Site Visit

    POMFRET, MD, UNITED STATES

    09.24.2019

    Photo by Sarah Lazo 

    U.S. Army Corps of Engineers, Baltimore District

    A wetland plant at Mattawoman Creek in Charles County, Maryland, Sept. 24, 2019. Mattawoman Creek is the initial site to be restored through the first Umbrella Mitigation Banking Instrument for the Department of Defense in Maryland. Mattawoman Creek yields nearly 38 wetland credits and almost 1,600 stream credits to provide potential mitigation for planned construction efforts on Joint Base Andrews, such as runway construction or expansion. More than 80 acres of land at the Mattawoman Creek mitigation site is now permanently protected via a conservation easement held by GreenTrust Alliance. The land was previously privately owned farmland. The U.S. Army Corps of Engineers, Baltimore District, managed the efforts of GreenVest and Princeton Hydro to complete the design; engineering and modeling; and permitting of the Mattawoman site. (U.S. Army photo by Sarah Lazo)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.24.2019
    Date Posted: 10.03.2019 16:17
    Photo ID: 5808280
    VIRIN: 190924-A-AQ354-0004
    Resolution: 3744x2792
    Size: 3.19 MB
    Location: POMFRET, MD, US

    Web Views: 13
    Downloads: 1

    PUBLIC DOMAIN