A U.S. Army Corps of Engineers contractor uses an excavator to lower a steel bollard barrier panel into place near El Centro, Calif., Sept. 12, 2019. These projects are being executed by USACE, as directed through the U.S. Army by the Secretary of Defense, in response to Department of Homeland Security’s request for assistance to help secure the United States southern border by blocking drug-smuggling corridors through the construction of roads and fences, and the installation of lighting under the Title 10, section 284 of the U.S. Code. DoD and USACE are executing these projects in support of U.S. Customs and Border Protection.
| Date Taken: | 09.12.2019 |
| Date Posted: | 09.16.2019 12:01 |
| Photo ID: | 5749782 |
| VIRIN: | 190912-A-HJ174-026 |
| Resolution: | 4884x3256 |
| Size: | 2.48 MB |
| Location: | EL CENTRO, CALIFORNIA, US |
| Web Views: | 13 |
| Downloads: | 6 |
This work, Army Corps of Engineers contractors make progress on border barrier near El Centro [Image 12 of 12], by Dr. Michael Izard, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.