Seymour Johnson Air Force Base, N.C. — Staff. Sgt. Moctar Sana and Senior Airman Courtney Wilking, 4th Civil Engineer Squadron pavement and production specialists, connect a generator to the flightline’s barrier control system Sept. 4, 2019, at Seymour Johnson Air Force Base, North Carolina. The 4th CES, to include equipment operators, electricians, plumbers, structural craftsman, heating, ventilation and air conditioning, and production technicians, are providing 24-hour response and recovery operations during and following Hurricane Dorian. (U.S. Air Force photo by Staff Sgt. Michael Charles)
| Date Taken: | 05.20.2017 |
| Date Posted: | 09.04.2019 13:21 |
| Photo ID: | 5720891 |
| VIRIN: | 190904-F-UJ108-117 |
| Resolution: | 5408x3600 |
| Size: | 1.96 MB |
| Location: | SEYMOUR JOHNSON AFB, NORTH CAROLINA, US |
| Web Views: | 39 |
| Downloads: | 9 |
This work, SJAFB prepares for Hurricane Dorian [Image 12 of 12], by MSgt Michael Charles, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.