Combat engineers assigned to Charlie Company, Special Troops Battalion, 2nd Heavy Brigade Combat Team, Fort Bliss, Texas, provide route clearance for 1st Squadron, 1st Cavalry Regiment during Network Integration Evaluation semi-annual capabilities assessment at McGregor Range, N.M., April 25, 2012. Their equipment includes two buffaloes (right) and two huskies (left under netting). The engineers assess roadways, remove obstacles or emplace them to impede the enemy from following cavalry movements. (US Army photo by Sgt. Barry St. Clair)
Date Taken: | 04.25.2012 |
Date Posted: | 04.30.2012 17:10 |
Photo ID: | 568877 |
VIRIN: | 120425-A-6562S-007 |
Resolution: | 4288x2848 |
Size: | 2.78 MB |
Location: | EL PASO, TEXAS, US |
Web Views: | 52 |
Downloads: | 8 |
This work, Network Integration Evaluation 12.2 [Image 13 of 13], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT