The Hescos bastion abutments for the future bridge are filled by a bucket loader with gravel in Jaji, Afghanistan.
Date Taken: | 09.12.2007 |
Date Posted: | 09.12.2007 14:57 |
Photo ID: | 56701 |
VIRIN: | 070909-A-9995D-001 |
Resolution: | 2100x1410 |
Size: | 326.65 KB |
Location: | PAKTYA PROVINCE, AF |
Web Views: | 96 |
Downloads: | 22 |
This work, Constructing the cornerstones of the Jaji bridge [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.