Minister Jamal Abbas Al-Adili, from the Government of Iraq Ministry of Water Resources, center, answers questions about the current conditions and operations of Mosul Dam during a press conference after the Change of Authority ceremony in Mosul, Iraq, June 15, 2019. The Change of Authority ceremony hands authority of operations from the U.S. Army Corps of Engineers to the Iraq Ministry of Water Resources (MoWR). The U.S. Army Corps of Engineers remained on the Mosul Dam project site to serve as technical engineers to provide architectural and engineering oversight for the maintenance, grouting, and rehabilitation of the bottom outlet of the dam while also helping to finish the crucial work required to repair the dam’s foundation and integrate the Iraq MoWR to handle future grouting operations. (U.S. Army Reserve photo by Spc. DeAndre Pierce)
Date Taken: | 06.15.2019 |
Date Posted: | 06.24.2019 04:06 |
Photo ID: | 5520033 |
VIRIN: | 190615-A-DJ607-1175 |
Resolution: | 4881x3254 |
Size: | 8.02 MB |
Location: | MOSUL DAM, IQ |
Web Views: | 36 |
Downloads: | 24 |
This work, Mosul Dam Change of Authority Ceremony [Image 19 of 19], by SSG DeAndre Pierce, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.