The commemorative document representing the Folsom Dam Water Control Manual, signed by representatives of various federal, state, and local agencies June 12, 2019. The newest version of the manual supports more accurate release decisions based on weather forecasts and uses the new auxiliary spillway more efficiently. The signing was a symbolic culmination of years of effort and thousands of man-hours invested in strengthening the dam and reducing risk for the entire Sacramento area.
Date Taken: | 06.12.2019 |
Date Posted: | 06.13.2019 13:34 |
Photo ID: | 5482006 |
VIRIN: | 190612-A-XI267-309 |
Resolution: | 5568x3712 |
Size: | 1.34 MB |
Location: | FOLSOM, CA, US |
Web Views: | 27 |
Downloads: | 2 |
This work, Updated Folsom Water Control Manual signed by USACE, Reclamation [Image 5 of 5], by Jeremy Croft, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT