USACE contractors complete a real-time kinematic (RTK) survey of the 15-mile El Centro sector. They are using a state-of-the-art receiver and data collector to interface with a radio base established about three miles east of this location at the western end of the sector. Here they are surveying the dimensions of the concrete portion of the roadbed.
Date Taken: | 06.04.2019 |
Date Posted: | 06.07.2019 14:34 |
Photo ID: | 5452431 |
VIRIN: | 190604-A-VS667-102 |
Resolution: | 3648x5472 |
Size: | 11.39 MB |
Location: | EL CENTRO, CA, US |
Web Views: | 13 |
Downloads: | 5 |
This work, Task Force Barrier - Survey of El Centro Sector [Image 5 of 5], by Sara Goodeyon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT