Pathfinder volunteers farm out and begin their trail cleanup at Thomaston Dam, March 7, 2019.
| Date Taken: | 04.07.2019 |
| Date Posted: | 05.13.2019 13:04 |
| Photo ID: | 5358773 |
| VIRIN: | 190307-A-A1420-001 |
| Resolution: | 3664x3024 |
| Size: | 10.03 MB |
| Location: | THOMASTON, CONNECTICUT, US |
| Web Views: | 21 |
| Downloads: | 1 |
This work, Thomaston Dam and longtime partner keep riding trails in peak condition for the public [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.