A Dam Safety Program inspector examines a spillway gate strut during a dam safety assessment. During the assessment, Portland District identified 16 dams that needed infrastructure rehabilitation and it has completed work at eight of those dams.
| Date Taken: | 03.12.1970 |
| Date Posted: | 05.07.2019 12:12 |
| Photo ID: | 5333033 |
| VIRIN: | 090609-A-QV191-0002 |
| Resolution: | 3072x2304 |
| Size: | 1.03 MB |
| Location: | OREGON, US |
| Web Views: | 29 |
| Downloads: | 1 |
This work, Dam: that's a lot of work - Corps completes spillway gate repair [Image 4 of 4], by Tom Conning, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.