A Dam Safety Program inspector examines a spillway gate strut during a dam safety assessment. During the assessment, Portland District identified 16 dams that needed infrastructure rehabilitation and it has completed work at eight of those dams.
Date Taken: | 03.12.1970 |
Date Posted: | 05.07.2019 12:12 |
Photo ID: | 5333033 |
VIRIN: | 090609-A-QV191-0002 |
Resolution: | 3072x2304 |
Size: | 1.03 MB |
Location: | OR, US |
Web Views: | 28 |
Downloads: | 1 |
This work, Dam: that's a lot of work - Corps completes spillway gate repair [Image 4 of 4], by Tom Conning, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT