Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    210th Engineering Installation Squadron Helps to Rebuild Tyndall [Image 1 of 4]

    210th Engineering Installation Squadron Helps to Rebuild Tyndall

    ST. PAUL, MN, UNITED STATES

    11.05.2018

    Courtesy Photo

    133rd Airlift Wing

    U.S. Air Force Master Sgt. Mark Melchert, 210th Engineering Installation Squadron, checks the status of a damage radio at Tyndall Air Force Base, Nov. 5, 2018. Melchert was part of team of installers and engineers who were responsible for reassembling three towers, moving ten radio systems and placing them onto a 260-foot tower, installing two antenna systems onto a 300-foot tower and supporting a Weapon System Evaluation Programs training exercise.
    (U.S. Air National Guard photo by Tech. Sgt. Erin Barry)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.05.2018
    Date Posted: 03.19.2019 09:30
    Photo ID: 5189552
    VIRIN: 181105-Z-ZZ999-0011
    Resolution: 4032x3024
    Size: 2.24 MB
    Location: ST. PAUL, MN, US

    Web Views: 57
    Downloads: 6

    PUBLIC DOMAIN